Immediate Release Alerts

◄ Back
April 21, 2021

84th Cir, Taylor Ct, 84th Ter Road Work

ASPHALT STREET REPAIRS WILL BEGIN WEDNESDAY, APRIL 21st

In the following order:
84th Circle
Taylor Court
84th Terrace


The work will consist of milling of existing roadway and asphalt patching as needed.

Please do not park on the roadway. Access could be limited to your driveway for brief periods of time.

It is difficult to determine length of time in each area. If necessary, contact Little Joe's Asphalt (913-721-3261) for questions.

You will be notified via separate door tag of the date we plan to return for asphalt overlay of the entire street.

PLEASE KEEP EVERYONES SAFETY IN MIND
BE ALERT OF MOVING EQUIPMENT AND WORKERS.
DRIVE SLOWLY THROUGH THE WORK AREA.

WE APPRECIATE YOUR COOPERATION DURING THESE STREET
IMPROVEMENTS

Facebook Twitter Email